Context:
The French leader in industrial gases won the contract to supply gas for the entire cryogenic system of Europe’s main space launcher. A transition between the development phase and the launch of mass production needed to be managed, concerning parts with complex industrial designs (sometimes requiring up to 5 subcontractors for a single part), in a very demanding quality-assurance environment.
The challenge was therefore to secure the supply chain, in terms of controlling costs and quality risks in the long term, and in terms of the schedule imposed by the program.